After posting the CCWP, the Floor Coordinator
  • Removes APS enable from the enclosure(s) affected by the work.
  • Takes a beamline global offline if needed for work to start.
  • Adheres a “Notice – Configuration Control currently undergoing change” tag below the Radiation Safety Systems (RSS) tag(s) on the affected component(s), or removes configuration control tag(s) from the component(s) to be worked on, if necessary.
  • Makes an entry in the FC shift log.