• Long-Range Schedule
  • Publications
  • Science Highlights
  • APS/User News
  • Directory
  • Useful Links
  • Contacts
ANL Home

a U.S. Department of Energy Office of Science User Facility

  • About
    • Overview
    • Visiting the APS
    • Code of Conduct
    • Mission & Goals
    • Organization Charts
    • PSC Leadership
    • Committees
    • ANL Job Openings
    • APS Job Openings
    • Storage Ring Parameters
    • APS Conference Rooms
    • The Advanced Photon Source Strategic Plan
    • Early Science at the Upgraded Advanced Photon Source
    • Seminars & Meetings
    • More
  • Safety
    • PSC Safety Resources
    • Electrical Safety
    • EFOG
    • User Safety and Training
    • Building and Site Services Coordination
    • Safety & Emergency Management
    • More
  • Organization
    • Accelerator Systems Division
      • Accelerator Operations & Physics
      • Controls
      • Diagnostics
      • Magnetic Devices
      • Power Systems
      • Radio Frequency
      • MCR
    • APS Engineering Support Division
      • Information Solutions
      • Information Technology
      • Design and Drafting
      • Experimental Facility Operation Group
      • Mechanical Engineering and Design
      • Mechanical Operations and Maintenance
      • Safety Interlocks
    • X-ray Science Division
      • Inelastic X-ray & Nuclear Resonant Scattering (IXN)
      • Magnetic Materials (MM)
      • Materials Physics and Engineering (MPE)
      • Surface Scattering and Microdiffraction (SSM)
      • Time-Resolved Research (TRR)
      • Chemical and Materials Science (CMS)
      • Dynamics & Structure (DYS)
      • GMCA Structural Biology Facility (MX)
      • Imaging (IMG)
      • Microscopy (MIC)
      • Spectroscopy (SPC)
      • Structural Science (SRS)
      • Beamline Controls (BC)
      • Beamline Instrumentation (BI)
      • Computational Science and Artificial Intelligence (CAI)
      • Detectors (DET)
      • Nanopositioning Support Lab
      • Optics (OPT)
      • Scientific Software Engineering and Data Management (SDM)
    • APS Upgrade Project
    • Organization Charts
    • More
  • User Info
    • User Check List
    • Returning to APS
    • Training for Users
    • Shipping Samples
    • ESAF system login
    • Proposal system login
    • More
  • Beamlines
    • Beamlines Directory
    • Comparable Beamline Options for Users
    • Requirements for Restarting Beamlines After the Shutdown
    • Sectors Directory
    • More
  • Machine Status
    • APS Storage Ring Current History
    • More
  • APS Upgrade
  • Media Center
    • APS/User News
    • Science Highlights
    • APS Fact Sheets
    • More
  • Home
  • About
  • ANL Job Openings
  • APS Job Openings
  • APS-U
  • APS/User News
  • Beamlines
  • Contacts
  • Directory
  • Document Central
  • Guest House
  • Industry
  • Intranet
  • Long-Range Schedule
  • Machine Status
  • Media Center
  • Organization
  • Publications
  • Safety
  • Science Highlights
  • Search
  • User Info
  • Useful Links
  • Work with Us
ANL Home

APS-EFOG

  • EFOG Staff
  • FC Shift Log
  • ESAF
  • ICMS
  • Work Request
  • Forms Roster
  • Current FC Schedule
  • Commissioning Schedule
  • Floor Coordinator Request

APS-UES-LMA

  • FC Training Manual
  • A-1: Architecture of the APS Facility
  • A-2: Comprehensive Floor Coordinator Tasks
  • A-3: The On-Shift Floor Coordinator
  • A-4: The Floor Coordinator Shift Log
  • A-5: Functional Description of APS Front Ends
  • A-6: Beamline Hardware and Optical Components
  • A-7: Personnel Safety System
  • A-8: Radiation Hazards and Mitigation
  • A-9: Search and Secure
  • A-10: Required Beamline Cabinet Information
  • A-11: The Configuration Control Work Permit
  • A-12: Beamline Shielding Configuration Control Policy & Procedure
  • A-13: Beamline Activity Approval Forms
  • A-14: Using EPICS
  • A-15: Global Online
  • A-16: Turning the Key
  • A-17: Standing Orders
  • A-18: Liquid Nitrogen Distribution System

FC Training Manual

Welcome to the Floor Coordinator Training Manual.Each lesson module will explain to the Floor Coordinator-in-training their role at the APS.Upon completion of each module, please see a fellow Floor Coordinator to review the module contents and answer any questions.

 

03.15.2018
  • Intranet
  • For Employees
  • Work with Us
  • Industry
  • Guest House
  • Document Central
  • Job Openings
  • Facebook
  • Twitter
  • YouTube
  • Flickr

The Advanced Photon Source is an Office of Science User Facility operated for the
U.S. Department of Energy Office of Science by Argonne National Laboratory
UChicago Argonne LLC | Privacy & Security Notice

  • Facebook
  • Twitter
  • YouTube
  • Flickr

The Advanced Photon Source is an Office of Science User Facility operated for the
U.S. Department of Energy Office of Science by Argonne National Laboratory
UChicago Argonne LLC | Privacy & Security Notice