Resource Page

For additional APS documents, please check the Document Central page. 

IDTitleOwner
APS Accelerator Safety Related Procedures
APS_1188832APS Safety Assessment DocumentJ. Quintana, PSC DALD-Ops
APS_2278796APS Accelerator Safety EnvelopeJ. Quintana, PSC DALD-Ops
APS_1185831Unreviewed Safety Issue DeterminationP. Rossi, WSE/PSC
APS_1693025APS Accelerator Safety Configuration Management PlanJ. Quintana, PSC DALD-Ops
APS_2213451Conduct of Operations Manual - APS User Experimental Facilities Operations Group (EFOG)A. Wayman, AES/EFO
Configuration Control of RSS
APS_1685081Change Control for Radiation Safety ShieldingW. VanWingeren, AES/EFO
APS_1192930Configuration Control Work Permit ProcedureW. VanWingeren, AES/EFO
APS_1414320Posting a Beamline or Front-End Configuration Control Work Permit and EFOG Type C Survey Information FormS. Flood, AES/EFO
APS_1205731Configuration Control Work Permit Procedure for Opening and Closing Labyrinths and Mini-HutchesS. Flood, AES/EFO
APS_1258901Procedure to Have Welding Performed on Experimental EnclosuresE. Hardt, AES/EFO
APS_1251334Use of the APS Enable KeyS. Bogdan, AES/EFO
APS_1186603Changing Beamline Global Online/Offline StatusA. Wayman, AES/EFO
APS_2285123APS Policy on Control of Radiation Safety System BypassesW. VanWingeren, APS/EFO
APS_1272108Securing Storage Ring Front End ShuttersS. Bogdan, AES/EFO
APS_1181699Working on Beamline and Front-End Shielding ComponentsA. Wayman, AES/EFO
APS_1192753APS Configuration Control for Personnel Radiation Protection ShieldingN. Moonier, APS User Safety Officer
APS_1192751Beamline Front End Shielding Configuration Control Inspection N. Moonier, APS User Safety Officer
Configuration Control for ODH
APS_2289829Change Control for ODH Monitors & Alarms B. Fieramosca, AES/EFO
APS_1191928Response Process for Oxygen Deficiency Hazard AlarmsB. Fieramosca, AES/EFO 
APS Floor Operations Procedures
APS_1273829Procedure for Administrative Restriction Forms on APS BeamlinesA. Wayman, AES/EFO
APS_1254023Locking an Experiment Station Containing Hazardous MaterialsA. Wayman, AES/EFO
APS_1273833Personnel Safety Systems (PSS) Trip and Fault Reset ProcedureA. Wayman, AES/EFO
APS_1273831Front-End Equipment Protection System (FE-EPS) Reset ProcedureA. Wayman, AES/EFO
APS_1192754Instruction for APS Beamline Front-End Exit Valve and Beamline Isolation Valve OperationT. Clute, AES/MOM
APS_2289320Opening and Closing LPPS1 Shutter on ID beamlinesA. Wayman, AES/EFO
APS_1280000Beamline Pre-Run ProcedureE. Hardt, AES/EFO
APS_1192778Experiment Enclosure Routine Radiation SurveysJ. Edwards. RP/RSO
APS_1265996Procedure for Performing the Planning and Execution of Shielding Verification ProcessA. Wayman, AES/EFO
APS_1410423Contractor and Construction ServicesD. Preuss, IS/Site Operations
APS_131331LOM/User Machine ShopS. Bogdan, AES/EFO
APS_1432154APS Protocol for Reporting Construction Vibration Issues for Beamlines S. Flood, AES/EFO
APS_1191124Procedure for the Management of Broken Beryllium Windows and Equipment Contaminated with Beryllium OxideESH/AES ESH Coordinator, PSC
APS_1420359Liquid Nitrogen Automatic Fill Station Operating InstructionsA. Stevens, FAC/APS-SO
APS_1410561Liquid Nitrogen Distribution System Alarm ResponseA. Stevens, FAC/APS-SO
APS_1257958APS Autoclave Maintenance, Performance Verification and Training LogbookN. Moonier, APS Biosafety Officer
APS Experiment Safety Procedures
APS_1187022APS Experiment Safety ReviewsN. Moonier, User Safety Officer, AES/EFO
APS_1179853Posting Experiment Authorization Forms / Experiment Hazard Control PlansA. Wayman, AES/EFO
APS_1258434User TrainingN. Moonier, APS User Safety Officer
APS_1180984User Electrical Equipment InspectionsS. Bogdan, AES/EFO
APS_1410269Radioactive Material Use at the APS W. VanWingeren, AES/EFOG
APS_1187383Radioactive SamplesW. VanWingeren, APS RSSRC Chair
APS_1410268Shipping, Receiving and Materials Transportation (including Hazardous Material Transportation)N. Moonier, User Safety Officer
Beamline Specific Procedures
APS_14448851-BM Mode Change ProcedureM. Spilker, AES/EFO
APS_16944541-ID Mode Change ProcedureM. Spilker, AES/EFO
APS_2291904 07-BM Mode Change ProcedureM. Spilker, AES/EFO
APS_16944557-ID Mode Change ProcedureM. Spilker, AES/EFO
APS_13039797-ID-C/D Laser Transport ConfigurationB. Fieramosca, AES/EFO
APS_2294614 9-ID Grand Tube Access J. Strzalka, XSD/DYS
APS_2291904 13ID C/D Mode Change Procedure P. Eng, GSECARS
APS_168026529-ID UHV Transport and Beam Stop ReconfigurationJ. McChesney, XSD/MM
APS_1680337Approved Final Beam Stops and ChambersS. Flood, AES/EFO
APS_144449832-ID Mode Change ProcedureM. Spilker, AES/EFO
Instructions/Guidelines
 Guide to Submitting a CCWP in ICMSW. VanWingeren, CCSM
 RSS Component ClassificationW. VanWingeren, CCSM
 Instructions for Making RSS TagsA. Wayman, Alternate CCSM
 Instructions for Purchasing RSS Tag BlanksA. Wayman, Alternate CCSM
 Routine Radiation Survey GuidelinesE. Hardt/M.Garcia, AES/EFO
 Liquid Nitrogen fill Station Emergency ProcedureA. Stevens, FAC/APS-SO
 APS Electronic Work Project Checklist User GuideS. Bogdan, AES/EFOG