35-BM and 38-AM Beamline Operations

System: 35-BM and 38-AM
Period: Users Beam and Machine Studies
Event: 35-BM and 38-AM operation

Control of 35-BM and 38-AM shutter operation has been turned over to the 35-BM and 38-AM (ASD) staff and the main control room (MCR) operators. The MCR has full operation of the beam-line shutter controls, and also the permit to allow shutter enable for the 35-BM and 38-AM beamline.

All other aspects of Floor Coordinator responsibilities are the same for the 35-BM and 38-AM beamline as for any other beamline. The contact point is the ASD beamline staff when present or the MCR operators.

 

Issuer: N. Moonier

Last Reviewed: 5/26/26