Beams and Applications Seminar: Upgrading Fermilab’s Accelerator Controls and Power Systems with ACORN

Type Of Event
Seminar
Sponsoring Division
APS
Location
Hybrid: 401/A500 and Virtual
Building Number
401
Room Number
A5000
Speaker
Christian Roehrig, FNAL
Host
Grass Wang
Start Date
04-10-2025
Start Time
3:00 p.m.
Description

ABSTRACT

The Fermilab Accelerator Complex is the largest national user facility in the Office of High Energy Physics (DOE/HEP) program and the only national user facility operating at Fermilab. Fermilab serves as the host to the Long Baseline Neutrino Facility/Deep Underground Neutrino Experiment (LBNF/DUNE), the laboratory’s flagship project for neutrino science that is under construction. LBNF/DUNE will be powered by megawatt beams from an upgraded accelerator, the Proton Improvement Plan II (PIP-II) that will replace the laboratory’s aging linear accelerator with a new one based on superconducting radio-frequency cavities. The Accelerator Controls Operations Research Network (ACORN) Project will support LBNF/DUNE and PIP-II by modernizing the accelerator control system and accelerator power systems. The project is at the conceptual design phase and looking to achieve Critical Decision 1 (CD-1) later this year. The scope and structure of the project will be presented, along with current design and technology choices. Specific challenges facing the project will be addressed, along with current thinking on solutions.
 

To report an event that is not listed, please contact webmaster, for additional synchrotron-related conferences, check lightsources.org.