EPICS Controls Argonne National Laboratory

Experimental Physics and
Industrial Control System

2002  2003  2004  <20052006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024  Index 2002  2003  2004  <20052006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
<== Date ==> <== Thread ==>

Subject: RE: meeting in July / ca interface specification
From: "Jeff Hill" <[email protected]>
To: "'Matthias Clausen'" <[email protected]>, <[email protected]>
Date: Tue, 14 Jun 2005 17:04:00 -0600
> I am thinking of guys like Tom Pelaia, Roland Mueller, Greg White, 
> (Andy Goetz?), and someone from Argonne, Jlab, Cosylab...
> Should we pass them the current state and ask them for their comments?

Free - as in beer - and also free - as in widest possible audience - peer
review labor! We will certainly be very grateful for there assistance. 

The interfaces I am working on are intended to be concise (good for these
guys also) but pretty low level (perhaps not good for that audience), and so
we will need to decide where the high level stuff needs to be before going
forward with a high level review perhaps. I have no problem with them
looking as the low level stuff as long as we explain that this is a
foundation interface, and that less efficient synchronous interfaces with
built-in (fixed property set) data types will also be supplied.

Jeff

-----Original Message-----
From: Matthias Clausen [mailto:[email protected]] 
Sent: Tuesday, June 14, 2005 9:41 AM
To: [email protected]
Subject: meeting in July / ca interface specification

Dear all,

at SLAC we have decided to hold the next meeting at Argonne  from 11 to 
15th of July.
Does this date still stand?
Does someone already know the precise dates - like i.e. no meeting on 
Friday?
I'll have to make plane reservations and get my trip approved.
Thanks :-)

Another issue:
It comes to my mind that the interface for channel access V4 should be 
also discussed and defined by those people writing the high level 
(machine)physics applications. They will probably have the highest 
demand for new features.
I am thinking of guys like Tom Pelaia, Roland Mueller, Greg White, (Andy 
Goetz?), and someone from Argonne, Jlab, Cosylab...
Should we pass them the current state and ask them for their comments?
Even though this functionality will be mainly used in EPICS Office 
applications I think we should discuss it inside and outside the EPICS 
Office framework. Please let me know what you think about it.
Will Kay and Doug coordinate this issue? Otherwise I'll be glad to help.

Looking forward to see you next month.

Regards
Matthias

-- 
------------------------------------------------------------------------
Matthias Clausen                         Cryogenic Controls Group(MKS-2)
phone:  +49-40-8998-3256                Deutsches Elektronen Synchrotron
fax:    +49-40-8994-3256                                    Notkestr. 85
e-mail: [email protected]                           22607 Hamburg
WWW-MKS2.desy.de                                                 Germany
------------------------------------------------------------------------



References:
meeting in July / ca interface specification Matthias Clausen

Navigate by Date:
Prev: RE: Fundamental Types document Jeff Hill
Next: Re: Fundamental Types document Ralph Lange
Index: 2002  2003  2004  <20052006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
Navigate by Thread:
Prev: Re: meeting in July / ca interface specification Kay-Uwe Kasemir
Next: Re: meeting in July / ca interface specification Doug Murray
Index: 2002  2003  2004  <20052006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
ANJ, 02 Feb 2012 Valid HTML 4.01! · Home · News · About · Base · Modules · Extensions · Distributions · Download ·
· Search · EPICS V4 · IRMIS · Talk · Bugs · Documents · Links · Licensing ·