EPICS Controls Argonne National Laboratory

Experimental Physics and
Industrial Control System

2002  2003  2004  <20052006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024  Index 2002  2003  2004  <20052006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
<== Date ==> <== Thread ==>

Subject: meeting in July / ca interface specification
From: Matthias Clausen <[email protected]>
To: [email protected]
Date: Tue, 14 Jun 2005 17:41:29 +0200
Dear all,

at SLAC we have decided to hold the next meeting at Argonne from 11 to 15th of July.
Does this date still stand?
Does someone already know the precise dates - like i.e. no meeting on Friday?
I'll have to make plane reservations and get my trip approved.
Thanks :-)

Another issue:
It comes to my mind that the interface for channel access V4 should be also discussed and defined by those people writing the high level (machine)physics applications. They will probably have the highest demand for new features. I am thinking of guys like Tom Pelaia, Roland Mueller, Greg White, (Andy Goetz?), and someone from Argonne, Jlab, Cosylab...
Should we pass them the current state and ask them for their comments?
Even though this functionality will be mainly used in EPICS Office applications I think we should discuss it inside and outside the EPICS Office framework. Please let me know what you think about it.
Will Kay and Doug coordinate this issue? Otherwise I'll be glad to help.

Looking forward to see you next month.

Regards
Matthias

--
------------------------------------------------------------------------
Matthias Clausen                         Cryogenic Controls Group(MKS-2)
phone:  +49-40-8998-3256                Deutsches Elektronen Synchrotron
fax:    +49-40-8994-3256                                    Notkestr. 85
e-mail: [email protected]                           22607 Hamburg
WWW-MKS2.desy.de                                                 Germany
------------------------------------------------------------------------


Replies:
Re: meeting in July / ca interface specification Kay-Uwe Kasemir
RE: meeting in July / ca interface specification Jeff Hill
Re: meeting in July / ca interface specification Doug Murray

Navigate by Date:
Prev: RE: Open source Real-time Oss / open source OS Jeff Hill
Next: RE: meeting in July / ca interface specification Dalesio, Leo `Bob`
Index: 2002  2003  2004  <20052006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
Navigate by Thread:
Prev: RE: RTEMS on Diamond Systems Prometheus/ EPICS IOC on eCos Jeff Hill
Next: Re: meeting in July / ca interface specification Kay-Uwe Kasemir
Index: 2002  2003  2004  <20052006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
ANJ, 02 Feb 2012 Valid HTML 4.01! · Home · News · About · Base · Modules · Extensions · Distributions · Download ·
· Search · EPICS V4 · IRMIS · Talk · Bugs · Documents · Links · Licensing ·