EPICS Controls Argonne National Laboratory

Experimental Physics and
Industrial Control System

1994  1995  1996  1997  1998  1999  <20002001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024  Index 1994  1995  1996  1997  1998  1999  <20002001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
<== Date ==> <== Thread ==>

Subject: Fwd: ISAC Achieves Full Energy Beam.
From: Dave Gurd <[email protected]>
To: [email protected]
Date: Fri, 22 Dec 2000 13:36:14 -0500
.... and here, after Steve Hunt's exciting news, is another great milestone for EPICS.  TRIUMF is not an EPICS facility, but the ISAC project is.  Congratulations to Rolf Keitel and his team.  What a great year end!!

Dave



Santa visited ISAC early this year.

Bob Laxdal and the High Energy Task Force measured a 1.5 MeV/u helium beam
at the Prague analyzing magnet located downstream of the final (fifth) DTL
tank.  His message is quoted below.

"Last night a 4_He^1+ beam was accelerated through the ISAC DTL to the
maximum energy of 1.5MeV/u.  This meets, on schedule, the first milestone
of the ISAC High Energy Accelerator Task Force.  Congratulations to
everyone involved for achieving this challenging goal.  We had many
doubters (including myself back in the first week of Nov. when Tank4 was
giving us headaches)."

This milestone will be followed, in the new year, by several months of
accelerator & HEBT commissioning.  The next major milestone is to
accelerate a radioactive beam to a Nuclear Astrophysics experiment in April
2001, when cyclotron operation is scheduled to begin again following the
winter shutdown.
                                                        Paul Schmor
                                                        ISAC Project Leader

Dave Gurd, Controls Group Leader
MS 6473
Spallation Neutron Source
701 Scarboro Road
Oak Ridge, TN, 37831

Phone:  (865) 241-6747
Fax:    (865) 241-6739

[email protected]

eFax:   (501) 423-6167*
        *Faxes sent to this number
        arrive by email and I can
        pick up anywhere.

Navigate by Date:
Prev: Stored beam in SLS !!! Steve Hunt
Next: Asking for help about iocInit Weixing Cheng
Index: 1994  1995  1996  1997  1998  1999  <20002001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
Navigate by Thread:
Prev: Stored beam in SLS !!! Steve Hunt
Next: Asking for help about iocInit Weixing Cheng
Index: 1994  1995  1996  1997  1998  1999  <20002001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
ANJ, 10 Aug 2010 Valid HTML 4.01! · Home · News · About · Base · Modules · Extensions · Distributions · Download ·
· Search · EPICS V4 · IRMIS · Talk · Bugs · Documents · Links · Licensing ·