EPICS Controls Argonne National Laboratory

Experimental Physics and
Industrial Control System

1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  <20162017  2018  2019  2020  2021  2022  2023  2024  Index 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  <20162017  2018  2019  2020  2021  2022  2023  2024 
<== Date ==> <== Thread ==>

Subject: deadlock in pcas 3.14.12.6-rc1
From: "Wang Xiaoqiang (PSI)" <[email protected]>
To: Epics <[email protected]>
Date: Thu, 10 Nov 2016 16:59:10 +0000
Hi,

I am testing the support of dynamic array in the recent base 3.14.12.6-rc1.
Using a normal pcaspy application, which updates ~15 Hz. It repeatedly gets into a deadlock state.

The analysis has been put up here
https://github.com/paulscherrerinstitute/pcaspy/issues/29

The solution could be reversing the lock order during casEventSys::process. But it does not seem to be easy,
because the chain of calls involved.

Best
Xiaoqiang

Replies:
Re: deadlock in pcas 3.14.12.6-rc1 Bruce Hill

Navigate by Date:
Prev: Re: Native NI LabVIEW/EPICS integration Luca Cavalli
Next: RE: Opinion on timing system for synchrotron beamlines isa.uzun
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  <20162017  2018  2019  2020  2021  2022  2023  2024 
Navigate by Thread:
Prev: Re: Native NI LabVIEW/EPICS integration Luca Cavalli
Next: Re: deadlock in pcas 3.14.12.6-rc1 Bruce Hill
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  2013  2014  2015  <20162017  2018  2019  2020  2021  2022  2023  2024 
ANJ, 05 Dec 2016 Valid HTML 4.01! · Home · News · About · Base · Modules · Extensions · Distributions · Download ·
· Search · EPICS V4 · IRMIS · Talk · Bugs · Documents · Links · Licensing ·