Subject: Re: sequencer programs in an IOC
From: Benjamin Franksen <benjamin.franksen@helmholtz-berlin.de>
To: <tech-talk@aps.anl.gov>
Date: Wed, 23 Jan 2013 15:54:09 +0100
On Tuesday, January 22, 2013 15:31:02 James F Ross wrote:
> It seems to be going running the program relating to the
> eemc (one of the early ones called by a seq command in the st.cmd file) but
> never moves on to the program after it.  There is no indication of error,
> but I'm looking at both the eemc source code and the bemc code (the next
> program called in the st.cmd file).

Which release of seq are you using? This sounds a bit like a known problem
with one of the earlier releases in the 2.1 series (see http://www-
csr.bessy.de/control/SoftDist/sequencer/KnownProblems.html#known-problems-in-
release-2-1-6).

When building, check that whenever snc is executed it does *not* have the '-i'
switch passed. If it does, search your Makefiles and remove '-i' from SNCFLAGS
definitions.

If you are using a release later than 2.1.6 this does not apply.

Instead of checking all PVs you programm variables are assigned to (as has
been suggested), you could play around with the -c flag to snc, at least to
make sure that missing PVs are really the cause of your problem (with -c the
programs start w/o waiting for connections; this may mean they will not work
correctly but at least you should see them running with seqShow).

Cheers
--
Ben Franksen
()  ascii ribbon campaign - against html e-mail
/\  www.asciiribbon.org   - against proprietary attachments

________________________________

Helmholtz-Zentrum Berlin für Materialien und Energie GmbH

Mitglied der Hermann von Helmholtz-Gemeinschaft Deutscher Forschungszentren e.V.

Aufsichtsrat: Vorsitzender Prof. Dr. Dr. h.c. mult. Joachim Treusch, stv. Vorsitzende Dr. Beatrix Vierkorn-Rudolph
Geschäftsführung: Prof. Dr. Anke Rita Kaysser-Pyzalla, Thomas Frederking

Sitz Berlin, AG Charlottenburg, 89 HRB 5583

Postadresse:
Hahn-Meitner-Platz 1
D-14109 Berlin

http://www.helmholtz-berlin.de


References:
sequencer programs in an IOC James F Ross
RE: sequencer programs in an IOC Mark Rivers
Re: sequencer programs in an IOC James F Ross

Navigate by Date:
Prev: RE: DXP ElapsedRealTime Mark Rivers
Next: Re: sequencer programs in an IOC Kevin Peterson
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  <20132014 
Navigate by Thread:
Prev: Re: sequencer programs in an IOC James F Ross
Next: Edm installation Steve
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  2012  <20132014 
ANJ, 31 Jan 2014 Valid HTML 4.01! · Home · News · About · Base · Modules · Extensions · Distributions · Download ·
· EPICSv4 · IRMIS · Talk · Bugs · Documents · Links · Licensing ·