EPICS Controls Argonne National Laboratory

Experimental Physics and
Industrial Control System

1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  <20122013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024  Index 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  <20122013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
<== Date ==> <== Thread ==>

Subject: Re: [APS Beamline_controls] asyn and vxWorks 5.4.2 and earlier
From: "Lazarski, Krzysztof Z." <[email protected]>
To: "Rivers, Mark L." <[email protected]>, "[email protected]" <[email protected]>, "[email protected]" <[email protected]>
Date: Fri, 10 Feb 2012 12:09:46 -0600
Hi Mark,

This is not a problem for SBC-CAT.
In our new architecture (recently implemented on our BM beamline) all real-time tasks are served directly from Delta Tau PMAC controllers and there are no dependencies on vxWorks.

Thank you,
Krzysztof


On 2/9/12 5:22 PM, "Mark Rivers" <[email protected]> wrote:

Folks,

John Hammonds and I have been doing some improvements to asyn that involve using C++ template functions and C++ exceptions.  We have found a serious problem with the vxWorks cross-compilers running under Linux with vxWorks 5.4.2 (and presumably earlier versions as well).  The cross-compilers crash on valid C++ code.  This problem does not occur on vxWorks 5.5.2, nor on Linux, Windows, etc.

My question to the community: will it be a serious problem if the next release of asyn cannot be built on vxWorks 5.4.2 and earlier?  Are there sites that would plan to upgrade asyn but continue to use vxWorks 5.4.2 or earlier?

I just upgraded my system this afternoon from 5.4.2 to 5.5.2 and recompiled asyn, sequencer, and all of synApps with no problems.

Thanks,
Mark


_______________________________________________
APS Beamline_controls mailing list
post: [email protected]
request: [email protected]
http://www.aps.anl.gov/mailman/listinfo/beamline_controls


--
+-------------------------------------------------+
Dr. Krzysztof Lazarski
Structural Biology Center, Beamline Software Development Coordinator
Argonne National Laboratory
9700 South Cass Avenue, Building 435 D002
Argonne, IL 60439-4830
ph: 630-252-3855, fax: 630-252-0564
[email protected]
www.sbc.anl.gov
+-------------------------------------------------+
--




References:
asyn and vxWorks 5.4.2 and earlier Mark Rivers

Navigate by Date:
Prev: Re: asyn and vxWorks 5.4.2 and earlier J. Lewis Muir
Next: Waveform record missing fields Mark Rivers
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  <20122013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
Navigate by Thread:
Prev: Re: asyn and vxWorks 5.4.2 and earlier J. Lewis Muir
Next: Re: asyn and vxWorks 5.4.2 and earlier Benjamin Franksen
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  2009  2010  2011  <20122013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
ANJ, 18 Nov 2013 Valid HTML 4.01! · Home · News · About · Base · Modules · Extensions · Distributions · Download ·
· Search · EPICS V4 · IRMIS · Talk · Bugs · Documents · Links · Licensing ·