Ken,
Thank you for giving me the opportunity to interview.
After reflection, I am not interested in that position.
Do you have anything else related to linux, networking, python programming in the valley?
I can update my resume if required.
Regards,
--
E
On 09:03 Tue 02 Aug , Ken Reed wrote:
> Could you please alert your subscriber base to the following open job
> opportunity?
> Albin Engineering has an immediate opening for an Instrumentation &
> Controls Engineer in the San Francisco Bay Area.
> In this position you will improve the reliability of and add features to
> various EPICS accelerator subsystems. Subsystems may include:
> · Laser Subsystem
> · Motion Control
> · Toroid Subsystem
> Qualifications:
> · Several years experience with the EPICS toolkit including building
> and releasing in the linux environment, Sequence Notation Language (SNL),
> IOC and EPICS Database development
> · Proficient with C programming language
> · Soft real-time low-level embedded programming experience
> · Experience with EPICS-based drivers
> This is a contractual position, initially for 6 months, with likely
> extension for a second 6 months and the potential of becoming a full-time,
> permanent position. Full benefits are included with the position.
> If you would like to candidate for this position, please respond asap with
> your most up to date resume and current contractual pay rate.
> Ken Reed, Account Manager
> Albin Engineering
> [email protected]
> Kenneth Reed
> Account Manager
>
>
>
> Albin Engineering Services Inc.
> 3350 Scott Blvd, Suite 27
> Santa Clara, CA 95054
> ph : 408-733-AESI (2374) x25
> cell: 408-623-3968
> fax : 408-739-AESI (2374)
> [email protected]
> www.aesi.com
>
>
>
>
--
Emmanuel
- References:
- EPICS Contract Position Ken Reed
- Navigate by Date:
- Prev:
Re: aSubRecord VAL field Andrew Johnson
- Next:
BOY Data Browser Issues Craig.Haskins
- Index:
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
<2011>
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
- Navigate by Thread:
- Prev:
EPICS Contract Position Ken Reed
- Next:
MAXv motors moving on cpu reset John M. Skinner
- Index:
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
<2011>
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
|