EPICS Controls Argonne National Laboratory

Experimental Physics and
Industrial Control System

1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  <20092010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024  Index 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  <20092010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
<== Date ==> <== Thread ==>

Subject: Re: Remote IOC reboot [was: EPICS for implementation of Remote Procedure Call]
From: Maren Purves <[email protected]>
To: Rolf Keitel <[email protected]>
Cc: [email protected]
Date: Thu, 16 Apr 2009 08:56:31 -1000
Hi Emmanuel,

we have taken a similar approach as Rolf suggests, but using networked
power switches. It's an extra expense, but as we do a lot of work
remotely most of our computers at the telescopes (not just IOCs)
are on networked power switches now. You just log into the switch
it's connected to and power cycle.

Maren

Rolf Keitel wrote:
Hi Emmanuel,

As a last resort, in the cases where the IOC is not accessible via CA, we implemented for our (less expensive) VME crates a remote power cycle. The crate's power supply is switched off by an external +24V signal which is provided by a PLC or another IOC. Important is only that the external signal is ultimately controlled by an IOC which is different from the one you are resetting.

- rolf -

Ralph Lange wrote:
......
For other (aka less expensive) crates some labs have developed VME cards that can be remotely accessed and are able to pull the VME reset line (plus more functionality). That is not free: A separate card always uses an extra slot.





References:
EPICS for implementation of Remote Procedure call Mahajan Kirti
Re: EPICS for implementation of Remote Procedure call Andrew Johnson
Re: EPICS for implementation of Remote Procedure call S. Banerian
Remote IOC reboot Was(EPICS for implementation of Remote Procedure call) Emmanuel Mayssat
RE: Remote IOC reboot Was(EPICS for implementation of Remote Procedurecall) Allison, Stephanie
Re: Remote IOC reboot [was: EPICS for implementation of Remote Procedure Call] Ralph Lange
Re: Remote IOC reboot [was: EPICS for implementation of Remote Procedure Call] Rolf Keitel

Navigate by Date:
Prev: Re: Remote IOC reboot [was: EPICS for implementation of Remote Procedure Call] Rolf Keitel
Next: RE: Remote IOC reboot [was: EPICS for implementation of RemoteProcedure Call] Luchini, Kristi
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  <20092010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
Navigate by Thread:
Prev: Re: Remote IOC reboot [was: EPICS for implementation of Remote Procedure Call] Rolf Keitel
Next: RE: Remote IOC reboot Was(EPICS for implementation of RemoteProcedurecall) Pearson, MR (Matthew)
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  <20092010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
ANJ, 31 Jan 2014 Valid HTML 4.01! · Home · News · About · Base · Modules · Extensions · Distributions · Download ·
· Search · EPICS V4 · IRMIS · Talk · Bugs · Documents · Links · Licensing ·