EPICS Controls Argonne National Laboratory

Experimental Physics and
Industrial Control System

1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  <20092010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024  Index 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  <20092010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
<== Date ==> <== Thread ==>

Subject: EPICS Meeting April 2009
From: Rolf Keitel <[email protected]>
To: tech_talk <[email protected]>
Date: Wed, 11 Mar 2009 12:02:53 -0700
This is a friendly reminder that the registration deadline for the Spring 2009 EPICS meeting in Vancouver is on

* March 31st, 2009 *

http://isacwserv.triumf.ca/epics09/meeting.pl

Hope to see you there - rolf -
-- 
+-------------------------------------------------------+
| Rolf Keitel, Ph.D.                Tel: (604) 222-7453 |
| Division Head, Engineering        Fax: (604) 222-7307 |
| TRIUMF                                                |
| Vancouver, B.C., Canada                               |
+-------------------------------------------------------+


Navigate by Date:
Prev: Re: EDM Freeze Problem Resolved Brian Bevins
Next: medm installation Mehta, Pratik
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  <20092010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
Navigate by Thread:
Prev: Re: EDM Freeze Problem Resolved Brian Bevins
Next: medm installation Mehta, Pratik
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  <20092010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
ANJ, 31 Jan 2014 Valid HTML 4.01! · Home · News · About · Base · Modules · Extensions · Distributions · Download ·
· Search · EPICS V4 · IRMIS · Talk · Bugs · Documents · Links · Licensing ·