EPICS Controls Argonne National Laboratory

Experimental Physics and
Industrial Control System

1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  <20092010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024  Index 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  <20092010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
<== Date ==> <== Thread ==>

Subject: Re: Basic record question (fanout / mbbo /longout)
From: Benjamin Franksen <[email protected]>
To: [email protected]
Date: Tue, 24 Feb 2009 12:01:56 +0100
On Tuesday 24 February 2009 01:56, Emmanuel Mayssat wrote:
> Is it possible to have a fanout that link to a record that is a CA_LINK
> instead of a DB_LINK. For some reason, for me it doesn't work.
> Reported error is
> ZT4612:2:AChnlFO.FLNK is a Channel Access Link  but does not access
> field PROC

This is described in the Application Developer's Guide, Chapter 5 "Database 
Locking, Scanning, And Processing"; for your particular issue see 
5.12.3 "FWDLINK". It seems like, but is not really, a limitation, since the 
only use of a forward link is to cause processing of the target record 
anyway, so all you need to do is add ".PROC" to the target of the FLNK.

Cheers
Ben
-- 
"TDD replaces a type checker in Ruby in the same way that a
strong drink replaces sorrows."       (byorgey on #haskell)

Any text below this line has automatically been added by the
mail server and does not necessarily represent my personal opinion.
-------------------------------------------------------------------

Helmholtz-Zentrum Berlin für Materialien und Energie GmbH   
Glienicker Straße 100, 14109 Berlin   
Vorsitzende des Aufsichtsrates: Dr. Beatrix Vierkorn-Rudolph   
Stellvertretende Vorsitzende: Dr. Jutta Koch-Unterseher   
Geschäftsführer: Prof. Dr. Anke Rita Pyzalla, Prof. Dr. Dr. h.c. Wolfgang Eberhardt, Dr. Ulrich Breuer   
Sitz der Gesellschaft: Berlin Handelsregister: AG Charlottenburg, 89 HRB 5583   

Information:   
Durch die Fusion mit dem ehemaligen Hahn-Meitner-Institut (HMI) ist   
BESSY nun Teil des neuen Helmholtz-Zentrum Berlin für Materialien   
und Energie (HZB).    

By the merger with the former Hahn-Meitner-Institut (HMI), BESSY   
became part of the new Helmholtz-Zentrum Berlin für Materialien und   
Energie (HZB).   

Disclaimer automatically attached by the E-Mail Security Appliance   
mail0.bessy.de 02/24/09 at Helmholtz-Zentrum Berlin GmbH. 


References:
Basic record question (fanout / mbbo /longout) Emmanuel Mayssat

Navigate by Date:
Prev: can't output strings array with gensub haquin
Next: Re: soft device for ai record works as sscanf. Tim Mooney
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  <20092010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
Navigate by Thread:
Prev: RE: Basic record question (fanout / mbbo /longout) Mark Rivers
Next: errlogPrintf from iocsh for soft IOCs? Allison, Stephanie
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  2008  <20092010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
ANJ, 31 Jan 2014 Valid HTML 4.01! · Home · News · About · Base · Modules · Extensions · Distributions · Download ·
· Search · EPICS V4 · IRMIS · Talk · Bugs · Documents · Links · Licensing ·