EPICS Controls Argonne National Laboratory

Experimental Physics and
Industrial Control System

1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  <20082009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024  Index 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  <20082009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
<== Date ==> <== Thread ==>

Subject: Engineer Position at SNS
From: "White, Karen S." <[email protected]>
To: [email protected]
Date: Tue, 29 Jan 2008 16:56:09 -0500

Dear Colleagues,

 

The Spallation Neutron Source in Oak Ridge, TN invites applications for a Cryogenics System I&C Engineer.

 

Summary:

The Neutron Sciences Directorate at Oak Ridge National Laboratory (ORNL) invites applications for a Cryogenic Systems I&C Engineer. With the world’s highest flux reactor-based neutron source (the High Flux Isotope Reactor) and the world's most intense pulsed accelerator-based neutron source (the Spallation Neutron Source), ORNL has become the world's foremost center for neutron science. Research at these facilities will encompass the physical, chemical, materials, biological, and medical sciences and will provide opportunities for up to 2000 researchers each year from industry, research facilities, and universities all over the world. To learn more about Neutron Sciences at ORNL go to: http://neutrons.ornl.gov.

Responsibilities & Qualifications:

The selected candidate will participate in the overall operation, support and updating of the SNS Cryogenic Control System and associated instrumentation. This includes day-to-day operations support for the cryogenic system controls. For control system upgrades and improvements, it includes: requirements specification and documentation, technical design, resource determination, scheduling, detailed cost estimating, installation oversight, and testing. The incumbent will interface closely with SNS Cryogenic System Staff, Accelerator Division technical staff, and implementation teams at Oak Ridge.

 

For more details, please visit:

https://jobs-ornl.icims.com/ornl_jobs/jobs/candidate/job.jsp?jobid=2699&mode=view

 

 

 

Regards,

 

Karen

 

Karen S. White

Controls Group Leader

Spallation Neutron Source

Oak Ridge National Laboratory

(865) 241-6747

 


Navigate by Date:
Prev: Re: asyn/stream reconnect problems Eric Norum
Next: VDCT Kazimierz Gofron
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  <20082009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
Navigate by Thread:
Prev: RE: asyn/stream reconnect problems Mark Rivers
Next: VDCT Kazimierz Gofron
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  2007  <20082009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
ANJ, 02 Sep 2010 Valid HTML 4.01! · Home · News · About · Base · Modules · Extensions · Distributions · Download ·
· Search · EPICS V4 · IRMIS · Talk · Bugs · Documents · Links · Licensing ·