Experimental Physics and Industrial Control System
|
Hi all,
I am currently preparing the talk for ICALEPCS on "EPICS - Future
Plans".
I have already received some input about current and future
developments - still missing some though...
I ran into the question: What are future plans without the perspective
of the users?
Are the plans matching the needs of the user base? What's on YOUR wish
list?
Therefore I'd like to ask you for some input.
Here's a task over the weekend... ;-)
Your site/ lab/ installation:
When did you start using EPICS?:
How many IOCs (roughly) are running on your site?:
Why are you using EPICS?
Please note the top five reasons:
What would your wish list for future EPICS releases look like?
(IOC, CA-Protocol, Applications, Collaboration ...)
Please mention your top ten wishes:
What are your current/planned developments that I could mention in my
presentation?
Thanks for your help!
-Matthias
p.s.
The first three answering to this mail will get a free drink (beer?)
during ICALEPCS (or the next possible occasion)!
OK - to be fair: The first from Asia, America and Europe ;-))
|
- Navigate by Date:
- Prev:
CA inside IOC - shutdown problem Heinrich du Toit
- Next:
Re: CA inside IOC - shutdown problem Andrew Johnson
- Index:
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
<2007>
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
- Navigate by Thread:
- Prev:
Re: CA inside IOC - shutdown problem Andrew Johnson
- Next:
Support module for KS3988 camac crate controller. Szalata, Zenon M.
- Index:
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
<2007>
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
|
ANJ, 10 Nov 2011 |
·
Home
·
News
·
About
·
Base
·
Modules
·
Extensions
·
Distributions
·
Download
·
·
Search
·
EPICS V4
·
IRMIS
·
Talk
·
Bugs
·
Documents
·
Links
·
Licensing
·
|