1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  <20072008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024  Index 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  <20072008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
<== Date ==> <== Thread ==>

Subject: Re: host watchdog and PLC
From: Emmanuel Mayssat <[email protected]>
To: [email protected]
Date: Mon, 17 Sep 2007 16:28:48 -0700
On Sat, 2007-09-15 at 15:09 -0600, Elder Matias wrote:
> Emmanuel,
> 
> I would agree with John, at the control system design stage you need to
> determine how you are allocating functionality to the sub-systems.  At
> the CLS we configure EPICS so that it can go down and equipment and
> people are still protected.    
> 

Oh, it seems that I misunderstood John's email... My apologies.
I assumed that he was not using a PLC. Yes, we want all the same thing
(no flame war here!) EPICS, computer, IOCs can go down, then the PLC
takes over...

What I am interested in is the detection of the computer failure, not
its resolution. The remote reboot facility which John describes is a
nice feature which I may decide to implement in the future.

To summarize, given my environment, to detect a computer failure, I may
just need a cheap PLC like the Koyo ones and connect it to the other one
I have in place (Siemens PLC not network enabled).

This may not be my final design, but already I would like to thank you
all for you useful suggestions.

Regards,
--
E


Replies:
RE: host watchdog and PLC Bryce Karnaghan

Navigate by Date:
Prev: Re: host watchdog and PLC Maren Purves
Next: RE: host watchdog and PLC Bryce Karnaghan
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  <20072008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
Navigate by Thread:
Prev: Re: host watchdog and PLC Maren Purves
Next: RE: host watchdog and PLC Bryce Karnaghan
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  <20072008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
ANJ, 10 Nov 2011 Valid HTML 4.01! · Home · News · About · Base · Modules · Extensions · Distributions · Download ·
· Search · EPICS V4 · IRMIS · Talk · Bugs · Documents · Links · Licensing ·