EPICS Controls Argonne National Laboratory

Experimental Physics and
Industrial Control System

1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  <20072008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024  Index 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  <20072008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
<== Date ==> <== Thread ==>

Subject: Job Opennings at NSLS II
From: [email protected]
To: [email protected]
Date: Tue, 10 Jul 2007 20:40:48 +0000
A new third generation light source is being built at Brookhaven. The control group is starting to be formed this year. We have passed our Critical Design 1 milestone and are starting to do advanced R&D and prototyping. The commissioning is expected to start in October of 2011. We hope to make some significant contribuitions in the following areas:
Intelligent Device Control Hardware and Software
RDB use for modelling and acclerator configuration
Physics Applications based on XAL and MATLab
EPICS base and tool development
 
The control group is responsible for the more traditional scope - including low level device control, timing system, machine protection, subsystem control, as well as the RDB, high level application phsyics tools and fast feedback. The group size is expected to be on the order of 15 people.
 
If you have some interest or would like to hear more about the project please contact me. We currently have two positions open, but we expect to open more positions in the very near future.
 
Thanks,
Bob Dalesio
 
 
--
Bob Dalesio
410 557 0297
443 834 3775 (cell)

Navigate by Date:
Prev: sequencer macro and debug log Emmanuel Mayssat
Next: Re: error code mapping best practice Maren Purves
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  <20072008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
Navigate by Thread:
Prev: sequencer macro and debug log Emmanuel Mayssat
Next: dbLoadRecord of dbLoadTemplate Emmanuel Mayssat
Index: 1994  1995  1996  1997  1998  1999  2000  2001  2002  2003  2004  2005  2006  <20072008  2009  2010  2011  2012  2013  2014  2015  2016  2017  2018  2019  2020  2021  2022  2023  2024 
ANJ, 10 Nov 2011 Valid HTML 4.01! · Home · News · About · Base · Modules · Extensions · Distributions · Download ·
· Search · EPICS V4 · IRMIS · Talk · Bugs · Documents · Links · Licensing ·