Experimental Physics and Industrial Control System
Title: Message
At 23:51 on June 8, 2006
first turn was achieved in the Storage Ring at the Australian Synchrotron.
Full energy electrons (3 GeV) were extracted from the Booster Ring, passed
through the Booster to Storage Ring Transfer Line and injected into the Storage
Ring. Three hours later 4 turns were observed following tuning of the
quadrupole magnets.
The next stage will
be to continue the process of tuning the timing system, magnets and other
parameters until tens of turns are achieved and then switching on the RF System
to store the beam.
The control system for
the synchrotron is almost completely based on EPICS, and the Controls
Team would like to thank all those in the EPICS community who have
given their time, advice and code in contributing to this
success.
Richard Farnsworth and Steven M.
Banks
Australian Synchrotron Project
Major Projects Victoria
800 Blackburn Road
CLAYTON VIC 3168
- Navigate by Date:
- Prev:
RE: Matlab MCA: arrays; maintain it; OSX Steven Banks
- Next:
javaIOC Marty Kraimer
- Index:
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
<2006>
2007
2008
2009
2010
2011
2012
2013
- Navigate by Thread:
- Prev:
RE: Matlab MCA: arrays; maintain it; OSX Steven Banks
- Next:
STAT -> SCAN Al Honey
- Index:
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
<2006>
2007
2008
2009
2010
2011
2012
2013