Experimental Physics and Industrial Control System
Here is some delayed news (I was on vacation - I should do this more
often, then good things happen).
On April 10, the ISAC-II facility accelerated a 40C (10+) beam through
the new superconducting linac (20 superconducting RF cavities) to 220
MeV (5.5 MeV/u). This achieved the last mile-stone of a five-year
development program, which was carried out in parallel to the routine
running of the ISAC-I radioactive beam facility.
This is another success for EPICS. Our sincere thanks go to everybody in
the EPICS community who helped with ideas, support, tools, etc. to keep
our fun-level high.
- rolf -
--
+-------------------------------------------------+
| Rolf Keitel, TRIUMF Tel: (604) 222-7453 |
| Group Leader ISAC Controls Fax: (604) 222-7307 |
| and Electronics Development |
| Vancouver, B.C., Canada |
+-------------------------------------------------+
- Navigate by Date:
- Prev:
Artificial Intelligence (AI) / intelligent control in the accelerator control room Martin Pieck
- Next:
Re: Sequencer intro needed ! Benjamin Franksen
- Index:
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
<2006>
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
- Navigate by Thread:
- Prev:
Artificial Intelligence (AI) / intelligent control in the accelerator control room Martin Pieck
- Next:
Power Monitoring Waggoner, Bill
- Index:
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
<2006>
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024