Experimental Physics and Industrial Control System
Hi,
I have EPICS R3.14.1 IOC running on Solaris-8 and it connects to EPICS
R3.13.0b12 PVs running
under VxWorks. As an interim safety measure I disconnect the routes between
the two IOCs at
night and reconnect them during the day.
However when I reestablish the routes, my R3.14 IOC PV never reconnects to
the VxWorks PVs.
It stays in STAT=LINK, SEVR=INVALID state. THe R3.14 PV is using a CPP
input link to the
VxWOrks PV. When I restart my R31.4 IOC it connects up right away.
Why doesn't the R3.14 PV reconnect automatically?
Is there a way to force the R3.14 PV to reconnect without having to restart
it?
Mahalo!
Kevin Tsubota
W.M. Keck Observatory
- Replies:
- Re: PV reconnect logic question Ernest L. Williams Jr.
- RE: PV reconnect logic question Jeff Hill
- Navigate by Date:
- Prev:
R3.14 compatible drvSerial and drvAscii Allan Honey
- Next:
Re: PV reconnect logic question Ernest L. Williams Jr.
- Index:
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
<2004>
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
- Navigate by Thread:
- Prev:
R3.14 compatible drvSerial and drvAscii Allan Honey
- Next:
Re: PV reconnect logic question Ernest L. Williams Jr.
- Index:
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
<2004>
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024