RF Window Test Overview
| 350 MHz Windows
|
| Test stand originally developed at Argonne
| Primary LabView system (Macintosh)
| RGA LabView system (PC)
| A/B PLC-5
| | | |
| Interface to High Voltage Power Supply and Klystron
|
| Conditioned 14 Windows to 1 MW, with 4
|
more to be conditioned ~30-APR-1998
| Ran at 1 MW for 3 to 4 hours
|
| Average time to 1 MW was 18.5 hrs. with a standard deviation of 7.1 hrs. (max = 39 hrs., min = 13 hrs.)
|
| All tests used EPICS interface and data archiving
|
|