RF Window Test Overview

350 MHz Windows

Test stand originally developed at Argonne

Primary LabView system (Macintosh)
RGA LabView system (PC)
A/B PLC-5

Interface to High Voltage Power Supply and Klystron

Conditioned 14 Windows to 1 MW, with 4

more to be conditioned ~30-APR-1998

Ran at 1 MW for 3 to 4 hours

Average time to 1 MW was 18.5 hrs. with a standard deviation of 7.1 hrs. (max = 39 hrs., min = 13 hrs.)

All tests used EPICS interface and data archiving