APS Beamline Commissioning Activity Approval Form


Sequence No : 24-ID-06-8
Sector : 24 Beamline : ID
Start Date : 1/31/06 Duration : 7/31/06
Date and Time of Submission : 01-30-06 15:52

Commissioning Envelope :
The maximum operating current is 100 ma
The minimum ID gap is 11 mm
Modes : White Beam in 24 ID A and B, Monobeam in 24 ID C

Activity Description:
Calibration and beamline readiness testing

Commissioning Team Members

First and Last Name AffiliationPhone Number
1. Malcolm Capel NE-CAT 2-0686
2. Kanagalaghatta Rajashankar NE-CAT 2-0694
3. Ed Lynch NE-CAT 2-0683
4. Jim Withrow NE-CAT 2-0691

Special Safety Concerns:
None

Submitted by Commissioning Activity Team Leader:
Name : Malcolm Capel Date : 01-30-06
E-Mail : capel@anl.gov

ADD for Operations Comment :
FC, Check all configuration controlled components are tagged in location.
Approved by ADD for Ops./Designee : on 01-30-06