APS Beamline Commissioning Activity Approval Form


Sequence No : 23-BM-06-2
Sector : 23 Beamline : BM
Start Date : 2/22/2006 Duration : 6 months
Date and Time of Submission : 02-22-06 14:55

Commissioning Envelope :
The maximum operating current is 100 ma
Modes : white beam in A and mono in B

Activity Description:
Commissioning Activities for 23-BM Beamline: 1) Deliver monochromatic beam to 23-BM-B for sheilding validation. 2) Commission optical components in 23-BM-A such as premask/collimator-1, collimator-2, monochromator and beam stop. 3) Install vertical collimating and vertical focusing mirors, white beam slits and monochromatic beam shutter. 3) Install and commissioning end station eqiupment in 23-BM-B. The scope includes activities such as monochromator energy scans, sagital focusing studies, collimating and focusing mirror studies, and characterization of end station hardware. Characterization of the end station will include diffraction experiments from lysozyme crystals.

Commissioning Team Members

First and Last Name AffiliationPhone Number
1. Robert Fischetti GMCA/ANL 2-0660
2. Derek Yoder GMCA/ANL 2-0674
3. Shenglan Xu GMCA/ANL 2-0661
4. Richard Benn GMCA/ANL 2-0666
5. Michael Becker GMCA/ANL 2-0673

Special Safety Concerns:
No safety issues are anticapated.

Submitted by Commissioning Activity Team Leader:
Name : Robert Fischetti Date : 02-22-06
E-Mail : rfischetti@anl.gov

ADD for Operations Comment :
None
Approved by ADD for Ops./Designee : on 02-23-06