APS Beamline Commissioning Activity Approval Form


Sequence No : 16-BM-05-3
Sector : 16 Beamline : BM
Start Date : 7/5/05 Duration : 1 day
Date and Time of Submission : 07-05-05 10:43

Commissioning Envelope :
The maximum operating current is 100 ma
Modes : white beam in 16 BM A , B and C stations

Activity Description:
Shielding Verification of Station C and shielded beam transport between A and C with 20mA and 50mA.

Commissioning Team Members

First and Last Name AffiliationPhone Number
1. Daniel Hausermann HP-CAT 0495
2. P.K Job APS 6573
3. Rod Salazar APS 9495
4. Mohan Ramanathan APS 3773
5. Eric Rod HP-CAT

Special Safety Concerns:
Both station A, B and C are all under Configuration Control. Station D will NOT be enabled. Ozone fan and monitor installed.

Submitted by Commissioning Activity Team Leader:
Name : Salazar Date : 07-05-05
E-Mail : salazar@aps.anl.gov

ADD for Operations Comment :
FC, check all critical and conf. control components in place
Approved by ADD for Ops./Designee : on 07-05-05