APS Beamline Commissioning Activity Approval Form


Sequence No : 07-BM-09-4
Sector : 07 Beamline : BM
Start Date : 02/19 Duration : 1 day
Date and Time of Submission : 02-19-09 01:16

Commissioning Envelope :
The maximum operating current is 100 mA ma
Modes : White Beam in 7BMA and in accordance with plan.

Activity Description:
A Radiation Shielding plan has been written by Steve Butela (APS_1282550) to test the radiation shielding of the 7BM-A hutch following a redesign of this beamline for fuel spray research. Although the shielding was first tested in 1998, the back wall of of 7BM-A has been redesigned and a P6 shutter was added. This procedure was reviewed in a BCRRT meeting (BCRRT Minutes APS_1282255).

Commissioning Team Members

First and Last Name AffiliationPhone Number
1. Steve Butala AES 4675
2. Eric Dufresne XSD 0274
3. Cindy Chafee AES 0300
4. Bruno Fieramosca AES 0201

Special Safety Concerns:

Submitted by Commissioning Activity Team Leader:
Name : Eric Dufresne Date : 02-19-09
E-Mail : dufresne@anl.gov

ADD for Operations Comment :
Remove enable after shielding verification under CAA. Notify AES Division Office of results after test. File: APS_1280713
Approved by ADD for Ops./Designee : John Quintana on 02-19-09