APS-U Upcoming Project Reviews
- Magnetic Final Design and 1.72 cm period Undulator Readiness Review - May 10, 2013
- High Heat Load Front End Final Design Review - May 21, 2013
- DOE Lehman Mini Review - July 22, 2013
Previous APS-U Project Reviews
- SPX Cryomodule Waveguide Review April 22, 2013
- Sector 27 & 28 and SPX Installation Readiness Review April 12, 2013
- SPX Programmatic Review March 18, 2013
- GRID XBPM Final Design Review March 8, 2013
- Short Pulse X-ray (PDR) Review February. 27 - March 1, 2013
- Short Pulse X-ray (PDR) Review (February 11, 2013)
- Beam stability Review January 31, 2013
- DOE/SC CD-2 Review (December 4-6, 2012)
- DOE ICE review (October 16-18, 2012)
- ANL Director's CD-2 Review (September 11-13, 2012)
- SPX R&D (SPX0) Review (August 23-24, 2012)
- Conventional Facilities (August 21, 2012)
- Optics/Detectors Review (August 21, 2012)
- Diffraction Beamline Review (August 14-16, 2012)
- Ultrafast Beamline Review (August 7-8, 2012)
- Front End and Beamline Standard Components Technical Review (July 24-25, 2012)
- Spectroscopy Beamline Review (July 19-20, 2012)
- Imaging Beamline Review (July 17-18, 2012)
- DOE/SC Review of the Advanced Photon Source Upgrade (APS-U) Project (June 13, 2012)
- Machine Advisory Committee Review (May 1-2, 2012)
- Informal review of EMVPU design concepts (February 28, 2012)
- Engineering Specification Document Review of SPX Cryogenic Refrigeration System (February 23-24, 2012)
- APPLE Undulator Specification Review (December 15, 2011)
- DOE ESAAB Review (August 3, 2011)
- SCU Measurement System Review (July 14, 2011)
- APS-U DOE CD-1 Review (May 17-19, 2011)
- APS-U Front Ends Technical Review (April 12-13, 2011)
- ANL Director's CD-1 Review (March 14-16, 2011)
- APS SAC Review (March 7-9, 2011)
- Short Pulse X-ray Review (March 3-4, 2011)
- Joint ANL/JLab Cavity System Design for APS-U SPX (February 9-10, 2011)
- Insertion Devices Review (January 27-28, 2011)
- Ultrafast Beamline Review (December 13-14, 2010)
- Diffraction Beamline Review (November 18-19, 2010)
- Imaging Beamline Review (November 10, 2010)
- Spectroscopy Beamline Review (October 26, 2010)
- Superconducting Undulator Status Review (October 22, 2010)
- Short Pulse X-ray Review (October 18-19, 2010)
- Accelerator Physics Review (October 14-15, 2010)
- Cost Review (October 12-13, 2010)