January 2006 Shutdown in pictures
The January 2006 shutdown was a very busy time for everyone at Sector 7.
You will find below a incomplete set of pictures of completed or
ongoing activities on the sector worth noticing.
-

Picture of the new 2nd crystal Compton shield as well as the new 1st crystal
Compton shield.
-

Same as previous in portrait mode.
-

The first crystal Compton shield.
-

The second crystal Compton shield (1.5 mm Cu) is cooled by a Cu braid
in contact with the monochromator tank.
-

Overview of Compton shields. Note the 2nd crystal shield stops above the
2nd crystal
and is bent to come as close as possible to the second crystal
cage.
-

Close up of 2nd crystal Compton shield.
-

Close up of 2nd crystal Compton shield (other view).
-

Close up of 2nd crystal Compton shield (3rd view).
-

The pair of new cryogenic lines going through the new 7ID-A labyrinth.
-

The pair of new cryogenic lines connected to the cryocooler.
-

A new cable tray between 7ID-B and 7ID-C for improved cable management.
-

Again, new cable tray between 7ID-B and 7ID-C (viewed close to 7ID-C).
-

Again, new cable tray between 7ID-B and 7ID-C (viewed close to 7ID-C).