May 2005 Shutdown in pictures
The May shutdown was a very busy time for everyone at Sector 7.
You will find below a incomplete set of pictures of completed or
ongoing activities on the sector worth noticing.
-
Jeremy Robinson, one of the winner of the student poster competition at the
APS User Meeting.
The new platform for the cryocooler on top of 7ID-A.
Downstream view of the new platform for the cryocooler on top of 7ID-A.
The flooring was not delivered at the time of the picture.
A new labyrinth on top of 7ID-B.
The new laser enclosure as viewed from the mezzanine on top of the storage
ring.
The new laser enclosure as viewed from the mezzanine on top of the storage
ring.(second view)
The new laser enclosure as viewed from the experimental hall.
Inside view of the new laser enclosure.
Inside view of the new laser enclosure looking downstream.