Beamline 7ID Schedule
/Sectors/Sector7/Operations/2007/7IDschedule_FY07_run1.html
Beamline 7ID Schedule for Run 1 of FY2007
See this link for
APS Operational data and schedules.
Here is the
link for the FY2007 schedule of the APS.
The first three weeks of the run will be in a new lattice with low Beta_x
at sector 8 and 32. One long period of 324 bunch mode runs is scheduled, Nov.
1-13. Note that from Dec. 6 to Dec. 12, the APS runs in hybrid mode with a
large current singlet of 16 mA. 20 shifts of 1296 bunch mode 5 are also
planned from Dec. 13 to 19. The run starts Oct. 3rd at 8am.
Schedule for the fall run of 2007
(FY07-run1 also called 2006-3 by APS)
Here is the link for the FY2007 schedule of the APS.
The (STAFF) flag indicates beamline staff time. The (PUP) label indicates beam
awarded to Linda Young's PUP-37 and each APS GUP proposal is labelled with its
proper number. A list of all current APS Partner User Proposals is available here.
The (COMM) label is reserved for commissioning and alignment. Special beamline
commissioning period allocated by XOR management are labelled (SPE).
Dates Shifts User
10/03 8AM - 10/10 8AM : 21 : New diamond mono commissioning (7ID-C SPE 18 + COMM 3)
10/11 8AM - 10/17 8AM : 18 : Rob Crowell (CHM) (7ID-D STAFF 18)
10/18 8AM - 10/23 8AM : 15 : B. Adams (7ID-D GUP-6063 15)
10/25 8AM - 10/31 8AM : 18 : D. Cahill (7ID-D GUP-6872 18)
11/01 8AM - 11/07 8AM : 18 : A. Lukaszew (7ID-C GUP-6190 18)
11/08 8AM - 11/13 8AM : 15 : Commissioning (7ID-D STAFF 10+ COMM 5)
11/15 8AM - 11/16 4PM : 04 : D. Walko (7ID-D STAFF 4)
11/16 4PM - 11/21 8AM : 14 : D. Reis (7ID-D GUP-4748 14)
11/21 8AM - 11/23 0AM : 05 : A. Grigoriev (7ID-C GUP-5311 5)
11/24 8AM - 11/29 4PM : 13 : A. Grigoriev (7ID-C GUP-5311 13)
11/29 4PM - 12/03 8AM : 11 : J. Jones (7ID-C GUP-6904 11)
12/03 8AM - 12/05 8AM : 06 : L. Young and staff (7ID-D COMM 6)
12/06 8AM - 12/12 8AM : 18 : L. Young (7ID-D PUP-37 18)
12/13 8AM - 12/20 0AM : 20 : R. Clarke (7ID-C 2 COMM + GUP-5290 18)
Allocation statistics
---------------------------------
total 196 shifts
operation allowance (8%) 16 shifts
New mono commisioning 18 shifts
GUP baseline 162 shifts
Avail. shifts Allocated shifts
COMM (beamline alignment) 16 3+5+2+6=16
New mono commisisoning 18 18
Staff (20% of 162) 33 18+10+4=32
PUP-37 18 18
GUP 111 15+18+18+14+18+11+18=112
GUP+PUP (80% of 162) 129 130
total: 196 196
Operational notes
XSD management reserved one week of extra commissioning to test the new Kohzu
HLD monochromator. We will make some upgrade to the monochromator and beamline
controls.
Last updated by Eric Dufresne on
10/03/2006.
|