7ID Schedule for Run 1 of FY2006
See this link for
APS Operational data and schedules.
Here is the
link for the FY2006 schedule of the APS.
Note that from Nov. 30 to Dec. 13, the APS runs in hybrid mode with a large
current singlet. One period of 324 bunch mode runs is scheduled, Nov. 2-8.
One week of 1296 bunch mode is also planned from Dec. 14 to 21.
Sector 7 schedule for the fall run of 2005
(FY06-run1 also called 2005-3 by APS)
Here is the link for the FY2006 schedule of the APS.
The (STAFF) flag indicates beamline staff time. The (PUP) label indicates beam
awarded through David Reis's Partner User Proposal PUP-47 , or Linda Young's
PUP-37 and each APS GUP proposal is labelled with its proper number. A list
of all current APS Partner User Proposals is available here. The (COMM) label
is reserved for commissioning and alignment.
Dates Shifts User
10/04 8AM - 10/09 4PM : 16 : Staff (COMM) Beamline alignment, repair
10/09 4PM - 10/21 8AM : 29 : Oscar Dubon (GUP-3255 18) and Walko (Staff 11) (7ID-C)
10/21 8AM - 11/01 8AM : 27 : David Reis (PUP-47) (7ID-D)
11/02 8AM - 11/06 8AM : 12 : E. Dufresne (3 Staff) + Ali Khounsary (9 GUP-4994)
11/06 8AM - 11/14 8AM : 21 : Emily Peterson (18 GUP-4761 + 3 PUP-37) (7ID-D)
11/16 8AM - 11/22 8AM : 18 : David Reis (18 GUP-4748)
11/22 8AM - 11/27 8AM : 11 : Don Walko TG weekend (Staff)
11/27 8AM - 12/13 8AM : 42 : Linda Young (PUP-37) (7ID-D)
12/14 8AM - 12/19 8AM : 15 : Sanjit Ghose (GUP-4764) (7ID-C)
12/19 8AM - 12/22 0AM : 8 : Don Walko (Staff) (7ID-C)
---------------------------------
total 199 shifts
operation allowance (8%) 16 shifts
GUP baseline (92%) 183 shifts
Avail. shifts Allocated shifts
COMM (commiss. & align.) 16 16
PUP-37 (hybrid run) 43 45
PUP-47 (15% of 183) 27 27
Staff (20% of 183) 36 11+3+11+8=33
GUP (reminder of 183) 77 (18+18+18+15+9=78)
total: 199 199
N.B. We expect the first week of the run to be very busy. We have to realign
the 7ID-A monochromator from scratch after taking it out of the beamline.
We have routine radiation surveys, and during the shutdown, a lot of
construction was completed.