7ID Schedule for Run 3 of FY2005
See this link for
APS Operational data and schedules.
Here is the
link for the FY2005 schedule of the APS.
Note that from Jun. 7 to Jun. 20, the APS runs in hybrid mode with a large
current singlet. One period of 324 bunch mode runs is scheduled, Jul. 6-11.
One week of 1296 bunch mode is also planned August 3-8.
Sector 7 schedule for the summer run of 2005
(FY05-run3 also called 2005-2 by APS)
Here is the link for the FY2005 schedule of the APS.
The (STAFF) flag indicates beamline staff time. The (PUP) label indicates beam
awarded through David Reis's Partner User Proposal(PUP-13), or Linda Young's
PUP-37 and each APS GUP proposal is labelled with its proper number. A list
of all current APS Partner User Proposals is available here. The (COMM) label
is reserved for commissioning and alignment.
Dates Shifts User
6/01 8AM - 6/06 8AM : 9 : Staff (COMM) Beamline alignment
6/01 8AM - 6/06 8AM : 6 : Linda Young (PUP-37) (7ID-D)
6/07 8AM - 6/20 8AM : 38 : Linda Young (PUP-37) (7ID-D)
6/21 8AM - 6/28 12AM : 20 : Roy Clarke (GUP-1506) (7ID-C)
6/28 8AM - 7/04 8AM : 18 : Walko (STAFF) (7ID-C)
7/06 8AM - 7/11 4PM : 16 : Dufresne (STAFF)
7/12 8AM - 7/18 8AM : 18 : Paul Evans (GUP-3824) (7ID-C)
7/20 8AM - 8/01 8AM : 35 : David Reis (PUP-47 + GUP-4299) (7ID-D)
8/03 8AM - 8/08 4PM : 16 : Alejandra Lukaszew (GUP-3730) (7ID-B)
8/09 8AM - 8/10 8AM : 3 : Dufresne (COMM) (7ID-B)
8/10 8AM - 8/15 4PM : 16 : Jim Penner-Hahn (GUP-1964) (7ID-B)
8/16 8AM - 8/18 4PM : 7 : Jonathan Lang (GUP-4465) (7ID-B)
8/18 4PM - 8/22 8AM : 11 : Kamel Fezzaa (GUP-2572) (7ID-B)
8/22 8AM - 8/26 12AM : 11 : David Reis (PUP-47) (7ID-D)
In June, our 7ID-A beamline monochromator stopped scanning smoothly. We were
not able to fix the problem and will have to remedy it in the September
shutdown. PUP-37 was affected by this problem, and some of the experimental
program had to be modified. Eric Landahl's experiment (GUP-4171) could not be
scheduled due to this beamline problem.
---------------------------------
total 224 shifts
operation allowance (8%) 18 shifts
GUP baseline (92%) 206 shifts
Avail. shifts Allocated shifts
COMM (commiss. & align.) 18 shifts (9+3)=12
PUP-37 (hybrid run) 38 shifts 38+6=44
PUP-47 (15% of 206) 31 shifts ~18+11=29
Staff (20% of 206) 41 shifts (18+16)=34
GUP (reminder of 206) 96 shifts (11+7+16+~17+16+18+20)=105
total: 224 shifts 224