MHATT-CAT 7ID Schedule
/Sectors/Sector7/Operations/2004/7IDschedule_FY04_run1.html
7ID Schedule for Run 1 of FY2004
See this link for
APS Operational data and schedules.
Here is the
link for the most up to date schedule.
The source is shutdown for the Thanksgiving holiday between Nov. 27/0am and
Nov 28/8am (4 shifts). Note that from Oct. 29 to Nov. 3, the APS will
test a high current mode (110 mA). From Dec 4/8am to Dec 15/4pm, the APS will
be run in hybrid mode with a large current singlet. Three separate 324 bunch
mode runs are scheduled.
Note that during the startup, we must perform a routine shielding validation
of all the hutches since it is overdue.
MHATT-CAT preliminary schedule for the fall of 2003
(FY04-run1 also called 2003-3 by APS)
Oct 1/8am-Oct 6/4pm(16) (7ID-B,C,D) Beamline startup and commissioning (7ID Staff)
Oct 7/8am-Oct 13/8am(18) (7ID-D) B. Adams (GUP-1578)
Oct 15/8am-Oct 21/8am(18) (7ID-D) J. Wang (CAT)
Oct 21/4pm-Oct 27/8am(17) (7ID-D) D. Reis (CAT)
Oct 29/8am-Nov 10/8am(34) (7ID-C) Y. Yacoby and R. Clarke (CAT)
Nov 12/8am-Nov 18/8am(18) (7ID-C) M. Mirecki (GUP-1507)
Nov 18/4pm-Nov 25/8am(20) (7ID-B) R. Livingston (GUP-77)
Nov 25/4pm-Dec 2/4pm(17) (7ID-C) R. Clarke (CAT interupted by TG 4 shifts)
Dec 04/8am-Dec 09/8am(15) (7ID-D) L. Young (GUP 1369)
Dec 09/4pm-Dec 15/4pm(18) (7ID-D) L. Young (GUP 1369)
Dec 16/8am-Dec 22/0am(17) (7ID-C) P. Evans (GUP-306)
Comm. and alignment = 16
CAT time: 18+17+34+17=86
GUP time: 18+18+20+15+18+17=106
total: 208
Last updated by Eric Dufresne on
11/05/2004.
|