MHATT-CAT 7ID Schedule
/Sectors/Sector7/Operations/7IDschedule_FY03_run2.html
7ID Schedule for Run 2 of FY2003
See this link for
the most current APS schedule.
Note that from Feb. 12 to 18, the APS will be run in high current mode (110 mA).
The large bunch current singlet mode will occur from April 9 to 14 and the
run will conclude with a test of the multibunch mode with likely 324 buckets
filled uniformly.
MHATT-CAT preliminary schedule for the winter of 2003
(FY03-run2)
Jan 29/8am - Jan 31/0am Commissioning (staff) 7ID-C
Jan 31/0am - Feb 3/4pm N. Pereira (GUP-10) 7ID-C
Feb 4/8am - Feb 10/8am P. Evans (GUP-306) 7ID-C
Feb 12/8am - Feb 18/8am E. Dufresne (MHATT) 7ID-C
Feb 18/4pm - Feb 24/8am T. Trainor (GUP-38) 7ID-C
Feb 26/8am - Mar 3/4pm A. Lukaszew (GUP 307) 7ID-C
Mar 4/8am - Mar 10/8am Roy Clarke (MHATT) 7ID-C
Mar 12/8am - Mar 18/8am F. Tsui (GUP-321) 7ID-C
Mar 18/4pm - Mar 24/8am R. Livingston (GUP-77) 7ID-B
Mar 26/8am - Apr 1/8am David Reis (MHATT) 7ID-D
Apr 1/4pm - Apr 6/8am David Reis (MHATT) 7ID-D
Apr 6/8am - Apr 14/4pm L. Young (GUP-56) 7ID-D
Apr 15/8am - Apr 21/0am Yet to be determined
Last updated by Eric Dufresne on
02/19/2003.
|