APS Technical Bulletin 14

TABLE OF CONTENTS

SECTION I. DEFINITIONS, GUIDELINES, AND REVIEW CRITERIA

  1. Introduction (July 21, 1998)
  2. 1.1 About the Advanced Photon Source
    1.2 About this Manual
  3. Beamline Definitions and Responsibilities (July 21, 1998)
  4. 2.1 Definitions
    2.2 Responsibilities
    2.2.1 APS Responsibilities
    2.2.2 CAT Responsibilities
  5. Reviews: General Information (July 21, 1998)
  6. Conceptual Design Review (July 21, 1998)
  7. Preliminary Beamline Design Review (December 5, 1994)
  8. 5.1 General Guidelines
    5.2 Specific Guidance and Review Criteria
  9. Final Design Review (January 20, 1995)
  10. Beamline Construction (July 21, 1998)
  11. Beamline Commissioning (July 21, 1998)

SECTION II. BEAMLINE-RELATED POLICIES

  1. Service-Corridor, Exit Aisles and Duck-Unders on the APS Experiment Hall Floor (May 1994)
  2. Guidelines for Ozone Mitigation at the APS (May 1994)

    ACGIH Threshold Limit Values

SECTION III. TECHNICAL UPDATES

  1. TUD-1 Experimental Station Address Model (May 17, 1994)
  2. TUD-2 TB-7 BM White Beam Back Wall Lead Specification (May 19, 1994)
  3. TUD-3 Deionized Water Supply Not Available for Beamline Use (May 20, 1994)
  4. TUD-4 The Addresses of Pentagons in the LOMs (May 23, 1994)
  5. TUD-5 Options for Procurement of Major Beamline Components by CATs, Rev. 2 (August 14, 1995)
  6. TUD-6 LOM Lab Roll-up Doors (March 29, 1996)
  7. TUD-7 Beamline Equipment Protection System to Personnel Safety System (PSS) (see TUD-27)
  8. TUD-8 Front End Equipment Protection System (EPS) to Beamline Equipment Protection System (EPS) (March 29, 1996)
  9. TUD-9 Personnel Safety System (PSS) User Guide (under revision)
  10. TUD-10 Beam Stop Policy (March 29, 1996)
  11. TUD-11 Experiment Hall Surveying References (August 7, 1997)
  12. TUD-12 Installing Equipment on the Roof of a Radiation Enclosure and/or Installing a Ladder to Reach Such Equipment (August 7, 1997)
  13. TUD-13 Beamline Electrical Safety Guideline (Rev. December 3, 1996)
  14. TUD-14 Experiment Hall Free of Obstruction above 15' (November 13, 1996)
  15. TUD-15 Policy for Management of Low-Activity Sealed Radioactive Calibration Sources by APS Users (March 18, 1997)
  16. TUD-16 Experiment Safety Review Process (August 12, 1997)
  17. TUD-17 TB-20 Errata (September 23, 1997)
  18. TUD-18 Vacuum Policy (December 8, 1997)
  19. TUD-19 Configuration Control Work Permit Policy and Procedure (December 9, 1997)
  20. TUD-20 Requirements for Front-End Differential Pump Installation (December 3, 1997)
  21. TUD-21 Shielding Configuration Control Policy and Procedure (December 10, 1997)
  22. TUD-22 Policy and Procedure for Use of Third-Party Contractors at the APS (November 16, 2000)
  23. TUD-23 Transportation of Small Quantities of Hazardous Materials (July 16, 1998)
  24. TUD-24 Deionized Water Supplied Through the XFD Operations Group (July 16, 1998)
  25. TUD-25 DOT authorizes cryo-preserved biological sample air transport (May 19, 1999)
  26. TUD-26 TB-7 erratum no. 2, bending magnet white beam transport requirement (May 20, 1999)
  27. TUD-27 Beamline Equipment Protection System to Personnel Safety System (PSS) (May 24, 1999)
  28. TUD-28 User Shipments from the APS (December 4, 2001)
  29. TUD-29 Labyrinth Orientation Requirements (January 21, 2003)
  30. TUD-30 Radiological Surveys on Tools, Materials & Equipment (January 21, 2003)
  31. TUD-31 Storage Ring Access for Emergency Repairs Policy (September 14, 2004)