APS Technical Bulletin 14
TABLE OF CONTENTS
SECTION I. DEFINITIONS, GUIDELINES, AND REVIEW CRITERIA
- Introduction (July 21, 1998)
- 1.1 About
the Advanced Photon Source
1.2 About this Manual - Beamline Definitions and Responsibilities (July 21, 1998)
- 2.1 Definitions
- 2.2 Responsibilities
- 2.2.1 APS Responsibilities
- 2.2.2 CAT Responsibilities
- Reviews: General Information (July 21, 1998)
- Conceptual Design Review (July 21, 1998)
- Preliminary Beamline Design Review (December 5, 1994)
- 5.1 General Guidelines
- 5.2 Specific Guidance and Review Criteria
- Final Design Review (January 20, 1995)
- Beamline Construction (July 21, 1998)
- Beamline Commissioning (July 21, 1998)
SECTION II. BEAMLINE-RELATED POLICIES
- Service-Corridor, Exit Aisles and Duck-Unders on the APS Experiment Hall Floor (May 1994)
- Guidelines for Ozone Mitigation at the APS (May 1994)
ACGIH Threshold Limit Values
SECTION III. TECHNICAL UPDATES
- TUD-1 Experimental Station Address Model (May 17, 1994)
- TUD-2 TB-7 BM White Beam Back Wall Lead Specification (May 19, 1994)
- TUD-3 Deionized Water Supply Not Available for Beamline Use (May 20, 1994)
- TUD-4 The Addresses of Pentagons in the LOMs (May 23, 1994)
- TUD-5 Options for Procurement of Major Beamline Components by CATs, Rev. 2 (August 14, 1995)
- TUD-6 LOM Lab Roll-up Doors (March 29, 1996)
- TUD-7 Beamline Equipment Protection System to Personnel Safety System (PSS) (see TUD-27)
- TUD-8 Front End Equipment Protection System (EPS) to Beamline Equipment Protection System (EPS) (March 29, 1996)
- TUD-9 Personnel Safety System (PSS) User Guide (under revision)
- TUD-10 Beam Stop Policy (March 29, 1996)
- TUD-11 Experiment Hall Surveying References (August 7, 1997)
- TUD-12 Installing Equipment on the Roof of a Radiation Enclosure and/or Installing a Ladder to Reach Such Equipment (August 7, 1997)
- TUD-13 Beamline Electrical Safety Guideline (Rev. December 3, 1996)
- TUD-14 Experiment Hall Free of Obstruction above 15' (November 13, 1996)
- TUD-15 Policy for Management of Low-Activity Sealed Radioactive Calibration Sources by APS Users (March 18, 1997)
- TUD-16 Experiment Safety Review Process (August 12, 1997)
- TUD-17 TB-20 Errata (September 23, 1997)
- TUD-18 Vacuum Policy (December 8, 1997)
- TUD-19 Configuration Control Work Permit Policy and Procedure (December 9, 1997)
- TUD-20 Requirements for Front-End Differential Pump Installation (December 3, 1997)
- TUD-21 Shielding Configuration Control Policy and Procedure (December 10, 1997)
- TUD-22 Policy and Procedure for Use of Third-Party Contractors at the APS (November 16, 2000)
- TUD-23 Transportation of Small Quantities of Hazardous Materials (July 16, 1998)
- TUD-24 Deionized Water Supplied Through the XFD Operations Group (July 16, 1998)
- TUD-25 DOT authorizes cryo-preserved biological sample air transport (May 19, 1999)
- TUD-26 TB-7 erratum no. 2, bending magnet white beam transport requirement (May 20, 1999)
- TUD-27 Beamline Equipment Protection System to Personnel Safety System (PSS) (May 24, 1999)
- TUD-28 User Shipments from the APS (December 4, 2001)
- TUD-29 Labyrinth Orientation Requirements (January 21, 2003)
- TUD-30 Radiological Surveys on Tools, Materials & Equipment (January 21, 2003)
- TUD-31 Storage Ring Access for Emergency Repairs Policy (September 14, 2004)

