CAT Chat Minutes
11/30/2009
Operations, Mark Beno
Beno announced that there had been one beam drop during the past week. It involved a power supply at Sector 12 that has since been repaired. There were also two other down time incidents for a total of 142 minutes. The Mean Time Between Faults was 98.53 hours and the Percentage of Scheduled Beamtime was 98.53 hours.
Safety, Edmund Chang
The December inspections involve Sectors 5 and 10. The Industrial Hygiene survey in machine shops will be done on Wednesday, December 2nd.
Next Meeting: Monday, December 7, 2009