CAT Chat Minutes
11/2/2009
Operations, Mark Beno
Beno announced that there had been one Beamline down time occurrence during the past week. 20 BM was down for 196 minutes due to a no switch fault.
The Percentage of Scheduled Beamtime was 97.27% and Meantime Between Faults was 59.99 hours.
Next Meeting: Monday, November 9, 2009