CAT Chat Minutes

10/26/2009

Operations, Mark Beno

Beno announced that there was a problem on 2-ID that lasted 208 minutes. Chain B PSS Communication Block fault indicated a major fault, removing Front End, Station B and Station E shutter permit. Locally, PSS panel indicated only a minor fault. AES-SI group found a failing communication I/O block. The fault was reset and the repair will be completed during the next machine studies. The percentage of Scheduled Beamtime was 96.35, and Mean Time Between Faults (MTBF) was 49.26 hours.

Safety

For H1N1 Influenza reporting, call 630-252-5000 or the web-based reporting tools at https://webaps.anl.gov/absence/.

Next Meeting: Monday, November 2, 2009