CAT Chat Minutes
November 5, 2007
Operations Update, George Srajer
Accelerator Downtime
- Intentional Dump – End of period
Beamline Downtime
- 23 ID - PSS serious fault. SI group found a DIW fault on chain B which prevented PSS fault from being reset
LOVE controller replaced - 5ID – Beam unusable during compacting for the SPX building project (counts went from 300K to less than 100)
No Intervention
Stats
- 99.36% - Beamtime
- 86.79 hours - Meantime between faults
Safety
Edmund Chang
- Acetone bottles are not for storage use.
- APS Engineering Support Division will be one of the nine divisions being audited.
- Traffic violations have been occurring more frequently. Please make sure ANL regulations are being followed at all times.
- October inspections took place in Bldg. 436 and are complete. The 401 labs are scheduled for November inspections.
Jim Lang
- Because of Continuing Resolution, upon suggestions from DOE:
Operations in FY2008 were tentatively reduced from to 4856 Hours- Difference is 18 shifts (144 hours)
- Run 2008-2 may be affected
- BAC for 2008-2 meets on April 8, 2008. Decision will be made by April 3
Next Meeting:
The next CAT Chat meeting will be held on November 12, 2007.