Operations Update, Mark Beno

Problems:

  • Loss in the feedback system (repaired)
  • Commonwealth Edison Power Problems
  • Vacuum trip in the RF sections
  • Power Supply

Stats:

  • 99.19% - Scheduled beamtime
  • 135 hrs. Meantime between faults

Safety, Paul Rossi

The lead surveillance was completed last week. The results should be in next week.

User Training, Bruce Glagola

Incomplete training is down to 14%. Overall things are going well. This week is the last chance to sign up for 387Z, Small Quantity class.

Next Meeting:

The next CAT Chat meeting will be held on June 25th at 3:00 p.m.