CAT Chat Minutes
November 21, 2005
Machine Stats
Currently running in top-up mode, machine studies beginning at midnight 11/16/2005.
Delivered Beam: 943.08 Hours
Percentage of Scheduled Time: 98.13 %
Downtime During Period: 17.97 Hours
Mean Time Between Faults (MTBF): 78.59 Hours
Fill |
Reason |
Downtime |
# 21 11/16 08:00 To 11/17 12:22 28.36 |
RF4 Problem [RF] |
0.39 RF4 HVPS problem, investigation, refill |
# 22 11/17 12:45 To 11/18 05:34 16.82 |
14-ID FE-EPS trip [SI] |
0.63 14-ID FE-EPS trip[SI.5],PAR RF fund.problem[RF.13] |
# 23 11/18 06:11 To 11/21 08:04 73.88 |
Fill Ongoing |
0.00 |
Beamtime Downtime Summary by APS Groups, 11/14/2005 to 11/21/2005 – No downtime reported.
Safety
December inspections include 431Z, 432, and 436.
New disposal containers to be distributed for solvent wipes refuse. The commercially purchased ready wipes need not be disposed of in these stainless steel cans.
Announcements
Liquid nitrogen for the distribution system will be delivered 11/25/2005.
Gas Yard Lighting – The photoelectric sensors have not been installed in all gas yards.
Training Reminder – Talk to Shop coordinator regarding machine shop training.