CAT Chat Minutes

December 22, 2003

 

General Information

Machine Stats - R. Klaffky:

            Delivered beam:   1622 hrs.
            Percentage of scheduled time:   97.38
            Downtime during period:   43.68 hrs.
            Mean time between faults:   55.94 hrs.

 

Faults:   Run 2-03 operations statistics

            #72 12/16 08:00 to 12/21 23:59, 136.00

 

Beamline Downtime:  Summary 12/12/03 00:00 to 12/18/03 23:59

Number Date Time Description Downtime Group Resolution
000326 12/19/03 12:20 FE EPS trip resulting in COMMI error requiring troubleshooting by system manager 1:00 SI 000326
000327 12/19/03 13:30 34ID-b low flow on A0SEP/L5 LOVE controller 0:15` ME 00327
00328 12/19/03` 9:00 FE EPS tripped due to FM3 DP 0:43 ME FE EPS reset by FC per system manager instructions