CAT Chat Minutes
December 22, 2003
General Information
Machine Stats - R. Klaffky:
Delivered beam: 1622 hrs.
Percentage of scheduled time: 97.38
Downtime during period: 43.68 hrs.
Mean time between faults: 55.94 hrs.
Faults: Run 2-03 operations statistics
#72 12/16 08:00 to 12/21 23:59, 136.00
Beamline Downtime: Summary 12/12/03 00:00 to 12/18/03 23:59
| Number | Date | Time | Description | Downtime | Group | Resolution |
| 000326 | 12/19/03 | 12:20 | FE EPS trip resulting in COMMI error requiring troubleshooting by system manager | 1:00 | SI | 000326 |
| 000327 | 12/19/03 | 13:30 | 34ID-b low flow on A0SEP/L5 LOVE controller | 0:15` | ME | 00327 |
| 00328 | 12/19/03` | 9:00 | FE EPS tripped due to FM3 DP | 0:43 | ME | FE EPS reset by FC per system manager instructions |