CAT Chat Minutes
November 17, 2003
General Information
Machine Stats - R. Klaffky:
Delivered beam: 912.7 hrs.
Percent of scheduled time: 96.48%
Downtime during period: 32.55 hrs.
Mean time between faults (MTBF): 45.64
Machine faults: Listing of statistics for Run 2-03
| # 39 11/12 08:00 To 11/12 23:14 15.25 | IOCS25FB Hung Task [DIA] | 0.40 Beam lost during reboot, refilled SR |
| # 41 11/12 23:38 To 11/13 22:17 22.64 | SR Gate Valve [CTL] | 0.39 SR Gate Valve VM:02:VV02 closed, refill |
| # 44 11/13 22:40 To 11/17 13:09 86.48 | 22ID EPS trip [SI] | 0.96 Recover from EPS trip, refill |
| # 52 11/17 14:07 To 11/18 07:59 17.88 | Int Dump: End of Period | 0.00 |
Beamline Downtime Report: Summary period 11/07-13/2003
| Number | Date | Time | Description | Downtime | Group |
| 000287 | 11/08/03 | 15:25 | VPN network down due to virus; impacted secondary tasks. | 0:55 | AOD-IT |
| 000290 | 11/12/03 | 08:00 | Faulty ID encoder. Temporary fix in place; repair planned for machine studies. | 0:20 | XFE |
| 000291 | 11/13/03 | 08:10 | Beryllium window replacement. | 2:09 | Beamline |
| 000293 | 11/13/03 | 17:08 | Replacement of cup seals and valves on integral shutter. | 3:20 | VAC |
APS General User Outreach S. Strasser: APS will once again be staffing a booth at the Material Research Society meeting from the 2nd through 4th. APS beamline resident staff members going to the meeting are invited to take an hour out of meeting to stand by the booth with user office personnel.
Automatic Paging for Power Outage B. Wesolowski: Bill announced that the auto paging system is up now. When you receive a page, contact Wendy VanWingeren, Floor Coordinator, ext. 0400.