CAT Chat Minutes
October 06, 2003
General Information
Machine Stats R. Klaffky :
Delivered beam: 113.54 hours
Percentage of schedule time: 93.74%
Downtime during period: 7.59 hours
Mean time between faults (MTBF): 12.62 hours
Listing of Statistics for Run3-2003:
| 0.06 SR Orbit Correction, 4 minutes [DIAG] | ||
| # 1 10/01 08:03 To 10/01 11:40 3.61 | Operator error .5 [OPS] | 3.18 PS.45 OAG=1.22 DIA.45 OAG.56-Beam loss |
| # 3 10/01 14:50 To 10/02 17:48 26.96 | S23 RTFB IOC error [CTL] | 0.52 Beam lost during recovery process - refill performed |
| # 6 10/02 18:19 To 10/02 22:04 3.75 | S9 EPS Trip [SI] | 1.91 Beam restored, S9 EPS Trip again, fill restored |
| # 8 10/02 23:59 To 10/03 15:21 15.38 | SR-RF3 Crowbar Trip [RF] | 0.32 RF reset, beam restored |
| # 9 10/03 15:40 To 10/04 04:28 12.79 | S9 EPS Trip [SI] | 1.09 Fault cleared, beam restored |
| # 11 10/04 05:34 To 10/05 11:40 30.11 | Water pump failure [ME] | 0.88 Switched to back-up pump, beam restored |
| # 14 10/05 12:33 To 10/05 22:03 9.50 | S9 EPS Trip [SI] | 0.61 Trip reset, beam restored |
| # 16 10/05 22:39 To 10/06 16:00 17.34 | Int Dump: End of Period | 0.00 |
Beamline Downtime Report: Beamline downtime summary, October 1, 2003 0800 to October 2, 2003 23:59
Number |
Date |
Time |
Beamline |
Description |
Downtime |
Group |
000221 |
10/1/03 |
08:05 |
08-ID |
Latched PSS fault due to loose wire on a connector. |
0:42 |
ES/PS |
000230 |
10/1/03 |
09:47 |
11-ID |
Water leak in EMW power supply. |
0:39 |
XFE |
000222 |
10/1/03 |
10:00 |
09-ID |
IOC/ EPICs communication failure. |
0:45 |
CTL |
000224 |
10/1/03 |
11:00 |
PSS was not notified of required tie-in for BLEPS upgrades. |
0:45 |
Beamline |
|
000225 |
10/1/03 |
12:00 |
19-ID |
Failed LOVE Controller requiring replacement. |
1:04 |
ES/PS |
The FY2004 Long Range Operations Schedule, October 2003-September 2004 DRAFT was shown.
Safety E. Chang: We have finished with inspections. We expect to hold a third machine shop training session. The task force to determine the failure has discovered the cause to be an undersized aluminum piece.
Regarding ANL sexual harassment training Users have asked if it is required to do work in the ring. Elroy did not know, but will look into whether or not it is considered a user requirement.
Emergency Access APS recommends users to make requests 48 hours before date of access.
Beamline Stats Y. Amer: Yeldez continues work on the stats that are due by end of week to DOE.