General Information
Machine Status R. Klaffky: Roger presented the following stats for Run 2-03 (13:06 6/30/03): delivered beam 640 hours, 94.46% of scheduled time, 37.48 hours downtime during period, and 33.66 hours mean time between faults (MTBF).
Machine faults:
|
# 28 06/25 08:28 to 06/25 20:47 |
12.32 hr. |
S40BQ1 failure |
Converter swap 0.36 refill |
|
# 29 06/25 21:24 to 06/30 10:49 |
109.42 hr. |
S32AV3 glitch |
0.31 refill |
Beamline Downtime Report: Summary period 6/20-26/2003
|
Date |
Time |
Beamline |
Description |
Downtime |
Group |
|
6/20/03 |
11:00 |
9-ID |
PS1, SV, and FEV closed. Reason unknown. |
0:15 |
VAC |
|
6/25/03 |
14:30 |
- |
BLEPS problem requiring hardware replacement. |
9:16 |
Beamline |
|
6/26/03 |
01:08 |
3-ID |
Network switch failure requiring call-in. |
3:37 |
ISS |
Safety E. Chang: The OSHA inspectors will be here on the afternoon of July 8th. Please note, if they wish to check your facility and cannot gain access, they will reschedule the visit.
Phil Colleran, former OSHA Inspector, has concluded his eight page write up which will be sent out on CAT-net for your information. Furthermore, a closeout meeting of OSHA findings by Phil will be held in building 401, conference room A1100 at 1:00 p.m. CATs are welcome to attend.
ESAF - B. Glagola: Bruce Glagola will be off-site from July 12th-20th and will not be available via internet. He will be approving those ESAFs submitted before the 12th . Note, if the ESAF makes reference to samples within the document, please remember to list the sample(s). This must be done before the ESAF can be approved.