News Flash

During the evening of June 21, 1995, Accelerator Systems Division commissioning team members met one of the APS design goals by injecting 5 mA to a single bunch in the APS storage ring. This goal was surpassed over the June 24-25 weekend when 8.5 mA was injected into a single rf "bucket" (one of 1296 bunch locations available in the ring).


Return to Inside This Issue