Nov, 23 2014 03:12:34 Top-Up resumed @ 03:08hrs.
Nov, 23 2014 03:01:17 Top-Up aborted @ 02:59
Top-Up abort due to an injector Power Supply issue.
Nov, 17 2014 12:54:44 Shutter permit enabled
Shutter permit was enabled at 12:50. 102mA stored, top-up is ongoing. -Ops
Nov, 17 2014 11:40:23 Stored Beam Lost
Stored Beam was lost at 11:33 due to an RF 4 trip. We are investigating.
Nov, 10 2014 16:16:09 Shutter permit was enabled at 15:51
Shutter permit was enabled at 15:51, with 102mA of stored beam.
Nov, 10 2014 15:18:38 Next fill ETA ~16:00
Next fill ETA ~16:00 due to ongoing timing issues.
Nov, 10 2014 13:42:47 Stored beam lost.
At 1:37PM on Nov 10, 2014, stored beam was lost, we are investigating. updates to follow, next fill ETA ~ 15:00 - Ops.
Nov, 03 2014 13:33:07 top up
At ~13:25 top up was aborted due to a par RF trip. Top up was resumed at 13:32