Filling Pattern Descriptions
User Operations (UO)
6 consecutive bunches used for BPM timing and containing a maximum of 12 mA
139 ns gap
21 singlets (single bunch) with a maximum current of 4 mA and a spacing of 153 ns
between singlets
460 ns gap
6 consecutive bunches used for BPM timing and containing a maximum of 15 mA
1.58 microsecond gap
8 groups of 7 consecutive bunches with a maximum current of 10.5 mA per group
and a spacing of 48 ns between groups
1.58 microsecond gap
end of pattern
Shielding Verification Schedule
Dedicated Verification (Beam Current 10 to 30 mA)
01-25-00: Shielding Verification of 4-ID-A
02-01-00: Shielding Verification of 4-ID-B and transport
To be determined: 8-BM-A
Parasitic Verification (Beam Current Approximately 100 mA)
15-ID-C and D
33-BM-C
Parasitic verification scheduling requires 48 hours prior notification