Shielding Verification Schedule Operating Cycle 1999-1
Type A Survey
5 BM C and D January 26 0800-1600
10 BM A February 23 0800-1600
15 ID B, DS wall of A February 23 0800-1600
Minihutch and transport
Type B Survey (Parasitic)
5 BM C and D mono-verification
7 ID Minihutch, C and D monostations
6 ID B and C monostations
9 ID B and C monostations
11 ID C and D monostations
Shielding Verification Schedule Operating Cycle 1999-2
Type A Survey
15-ID Re-verification of 15-ID B and B1 after mitigation dedicated B, B1 - March 30.
Type B Survey (Parasitic)
6 ID B and C mono-verification parasitic
7 ID C and D mono-verification parasitic
9 ID B and C mono-verification parasitic
11 ID C and D mono-verification parasitic
Type C Survey (Parasitic)
10 BM A - white beam station type C survey
Parasitic survey requires 48 hours advance readiness notification to schedule Health Physics.